Knitting Progress
I didn't get as much knitting done as I had hoped. Watching Little J is a full time occupation, and I found out that co-pilot (while driving a car) can be a very active position. (Chicago and Milwaukee are confusing! Especially in the dark!) However, here's what we have...
First up, Christmas in Tallin Stocking #1. This has been done for awhile, but I didn't have a finished pic of it. I think on the next one I'll do, I'll make the foot a bit longer. The pattern was done in fingering(?) weight yarn, and I didn't know how long I should knit it in this worsted weight.
Side 1:
Side 2:
And, the Sage Clessidra Stockings. I worked on these on Wednesday. I can work ribbing in the dark! Not the rest of it, though. I did try. But on Thanksgiving I had several hours that I worked on the pattern. I was very impressed with myself, until I reached the 23 row of the pattern. umm....i'm no longer full of myself. The main cable pattern isn't where it was supposed to be. And, I think it will make an obvious difference when I knit the second stocking. So, I'm going to undo the main cable section and reknit it. Just the cable section, b'cause I don't want to rip the entire thing.
And, my beginning of Yarn Harlot's Unoriginal Hat. If you're looking for it on Ravelry, I'm calling it the "Cool Kid's Hat". I haven't did very much (I started it after I realized I had a problem with Clessidra) but I think the gauge is working out okay, even with larger needles than the pattern called for.
1 comment:
WOW Marigold
im impressed with your christmas stocking it looks so intricate,
well done you..
Post a Comment